Ashish Kumar (Faculty)

Share:

Ashish Kumar

Assistant Professor ,
Department of Civil Engineering

9475474551   |   ashishce@mitmuzaffarpur.org



Qualifications
Masters of Technology in Civil Engineering with Transportation Engineering as specialisation from Indian Institute Of Technology Kharagpur
Subject Expertise
Pavement Engineering
Pavement evaluation and Rehabilitation
Traffic Engineering
Geotechnical Engineering
Area Of Research
Pavement Engineering
Professional Experience
Employer: West Bengal Highway Development Corporation Limited Duration- 02nd June 2014 – 13th February 2018 Position Held: -Assistant Project Manager
Projects Executed
Following Projected has been executed at the capacity of Assistant Project Manager :
West Bengal North-South Road Corridor Project (Sub-regional Port Connectivity) comprising SH4 and SH7– Technical Assistance of ADB in preparing the feasibility and Detailed Project Report (DPR) (TA No. 8007-IND). Estimated Civil Cost: INR 3,241 Crores Responsibilities :Review of Pavement Design, Traffic Characteristics, Geotechnical and Structural Design, Involve in Vetting of DPR from IIT Kharagpur. Coordination for project clearances from Railway and Irrigation department. Regular coordination with various missions of ADB. Preparation of entitlement matrix. EOI for supervision consultancy of Tranche-1.
Strengthening and widening of Chanditala – Seakhala –Champadanga section of SH-15 in West Bengal, KM CH 0.00 to CH 36.20 Civil Cost: 155.34 Crores Description Of Responsibilities :Work as a site representative of WBHDCL. Coordination with various department for utility shifting, Acted on behalf of Highway Authority for encroachment removal, Evaluation of Project Progress, Certification of payment for contractor, Design Consultant and supervision consultant. Managed and coordination with contractor, supervision consultant and design consultant. Review of Pavement design. Review of approvals given by supervision consultant. Coordination with administrative departments.
Barrackpore-Kalyani -Dumdum Expressway in district of North 24 Paraganas Estimated Civil Cost : INR 1,898 Crores Responsibilities : Preparation of RFP for DPR consultant. Appointment and Monitoring of DPR consultant. Observations on prepared DPR on various technical aspects, Coordination for Vetting of designs from IIT. Recommendation of payments. Various tenders monitoring for maintenance of roads from preparation of tender documents, evaluation of proposals, LOA, works supervision and recommendation of payment . Measures for elimination of black spots. Preparation of e-NIT for user fee collection, finalissation of base price, evaluation of NIQ, monitoring of user fee collecting agency. RFP for Financial Consultant for HAM model, Evaluation of proposal. Utility shifting. Replies to state assembly questions.
Consultancy services for Preparation of draft Toll Policy and draft Amendments to the relevant Acts for Government of West Bengal Responsibilities : Preparation of RFP. Evaluation of Technical and Financial bid in procurement of Consultant. Different follow up action with the selected consultant PWC. Review Of Draft documents and drafted the summary for placing to the State Cabinet.
Consultancy services for construction and development of a commercial complex cum computerized multiple layer car parking in the vacant land at K.S. Roy Road, B.B.D. Bag Kolkata Responsibilities : Evaluation of Technical and Financial bid in procurement of Consultant. Monitoring of various survey works done by the consultant. Evaluation of Inception Report and Feasibility report. Coordination with various departments such as Traffic Police, Fire Department, Archaeological Society of India, Kolkata Municipal corp. etc.
Strengthening and widening of Ghatakpukur – Malancha – Serberia Section (From 29 KMP to 60 KMP) of Kolkata Basanti Road (SH-3) Responsibilities : Work as a site representative of WBHDCL Modification of Pavement Design with consultation with IIT Kharagpur. Evaluation of project progress, Certification of payment for contractor, Design Consultant and supervision consultant. Managed and coordination with contractor, supervision consultant and design consultant
Preparation of Detailed Project Report for proposed G+5 storied administration building of WBHDCL at Dr. Deodhar Rahman Road, Lake Gardens Responsibilities : Preparation of TOR for DPR consultant. Appointment and Monitoring of DPR consultant. Payment OF DPR Consultant. Assistance in fire approval. Review of Structural Design, Drawings, Estimates etc
“Consultancy Services for Construction Supervision for Widening and Strengthening of existing road corridor connecting Mogra on SH-13 in Hoogly District with Barajaguli on NH-34 in Nadia District via Triveni, Boropara, Kalyani and Kampa to 4/6 lane divided carriageway including Grade-separated corridor, ROB at Bansberia and six-lane Extra-dosed Cable-stayed Bridge over river Hoogly beside Iswar Gupta Setu at Kalyani in the State of West Bengal, India (Approximate length: 21 Km.) [PACKAGE-III]” Estimated Civil Cost : INR 1396 Crores Responsibility: Drafting the RFP documents alongwith Terms Of References.
Technical vetting of Detailed Project Report for Muzaffarpur Smart City
List Of Publications
No Download(s) Available!